Projects / Stormwater / Watershed
West Goodlette Phase 2 - ICPR Modeling Support
The clients requested to develop and design infrastructure improvements in the West Goodlette-Frank Road neighborhood area. The goal is to address existing street and yard flooding issues as well as to provide on-site stormwater quality treatment and possible attenuation of flows and pollutants prior to discharge into the Goodlette Frank Road ditch and eventually to the Gordon River.
- CLIENT
- City of Naples and Collier County(subconsultant to Grady Minor)
- YEAR
- 2021 - ongoing
- APPLIED SKILLS
- H&H Modeling: Data mining & processing; model conceptualization & setup
Design storm simulations
Flood mapping
Level of Service
Scenario evaluations - CONSULTING AREAS
- Storm water management
- SOFTWARE
- ICPR, ArcMap
Specifics
LAGO developed a detailed ICPR model for the project areas that consisted of 324 subbasins, 577 nodes, and 1550 links. The model was verified by using reported flood conditions, and the design storm results compared with the ones from the existing XP-SWMM model for the Gordon River.
The existing conditions model will be used to verify and optimize the proposed drainage improvements in the design.
