SBA-CERTIFIED EDWOSB GSA MAS 47QRAA22D009K All certifications →
Mon–Fri 9am–6pm ET support@lago-consulting.com
Solutions
Projects Toolbox
About
Contact

SBA-certified EDWOSB · GSA MAS 47QRAA22D009K · Mon–Fri 9am–6pm ET

Projects  /  Stormwater / Watershed

Stormwater / Watershed · 2018 - 2021

Silver/Twin Lakes Watershed Management Masterplan Update

Lago was the prime contractor for this stormwater management project. The Silver/Twin Lakes Watershed Management Masterplan was updated on behalf of Hillsborough County.

All projects
CLIENT
Hillsborough County
YEAR
2018 - 2021
APPLIED SKILLS
Geo-spatial data management
H&H Modeling: Data Collection, Processing, Conceptualization, & Setup
Design Storm Simulations
Flood Mapping
Scenario Evaluations
Level of Service
Cost Estimation
CONSULTING AREAS
Stormwater management
SOFTWARE
ArcMap, ArcHydro, Fill Sinks Plus, HC-SWMM5

Specifics

LAGO developed a comprehensive geodatabase of stormwater infrastructure in the study area, defined model rainfall/runoff parameters, used a customized tool to write the model directly from the database, verified the model calibration and completed the mapping of flooded areas, as well as the level of service analysis for roads. The model was PEER review, and LAGO proposed and evaluated several alternatives to reduce flooding in the study area. LAGO provided future project recommendations and cost estimates to the County.

Figures