The Pemberton/Baker Canal Watershed Management Masterplan was updated on behalf of Hillsborough County. The work effort included field verification of structures and updating the GWIS database.
- CLIENT
- Hillsborough County(sub-consultant to ATKINS)
- YEAR
- 2017-2018
- APPLIED SKILLS
- GIS data management and tools
H&H modeling: Data collection & processing; model conceptualization & setup - CONSULTING AREAS
- Stormwater management
- SOFTWARE
- HC-SWMM5, ArcMap, ArcHydro, Fill Sinks Plus
Specifics
LAGO has been assigned the Campbell branch portion of the project area. Thus, we completed the field work, processed the DEM to delineate subbasins and find flow ways, updated the GWIS database, which included the definition of the parameters for each subbasin, nodes and links in the watershed.
Outcome
The data collected and processed for the area assigned was provided to ATKINS. This included data in the HC SWMM 5 GWIS Geodatabase format with SWMM model specific feature classes.