Projects / Stormwater / Watershed
Stormwater / Watershed · 2019 - 2020
Local BCA Project Analysis
LAGO was the prime contractor for this effort to define a Benefit Cost Analysis (BCA) score for three unfunded stormwater management projects in Hillsborough County.
- CLIENT
- Hillsborough County
- YEAR
- 2019 - 2020
- APPLIED SKILLS
- Geo-spatial data management
H&H Modeling: Data collection, processing, conceptualization, & setup
Design storm Simulations
Flood mapping
Scenario evaluations
Level of Service (LOS)
Cost estimation - CONSULTING AREAS
- Stormwater management
- SOFTWARE
- ArcMap, ArcHydro, Fill Sinks Plus, HC-SWMM5
Specifics
For each unfunded project, LAGO was responsible for updating and refining the watershed SWMM5 model that contain the project area. The refined model is used to compute the road LOS (Level of Service) at the project location. One or two possible solutions to the flooding problem was modeled and a post-project road LOS was calculated. Finally, LAGO developed a cost estimate for the preferred alternative and completed the Benefit-Cost Analysis (BCA) spreadsheet.
Figures